Belgrade — Ohrid by electric car

About 577 km via Jagodina, Niš, Vranje, Kumanovo, Skopje, Tetovo, Gostivar, Kičevo. Fast chargers within 5 km of the road: 35 (of them 150 kW and more: 5).

Data as of 09.11.2026

Suggested stops (at most 150 km apart)

The farthest fast charger within 150 km of the previous stop, the more powerful one when two are close. Kilometres are an estimate along the route. Check the place on the map before you go.

kmPlaceCountrykWPointsMap
145Ćuprija · Charge&GO
Futura Park Paraćin
Serbia1202on the map
270Leskovac · Charge&GO
Stop Shop Leskovac
Serbia603on the map
414Čair · Porsche MakedonijaNorth Macedonia1602on the map
577Ohrid · ЕВН Македонија
Кеј Македонија
North Macedonia1502on the map

Stretches without a fast charger in the data

km 414 – 577: no fast charger with reliability 70+ within 5 km of the road in the public layer.

This is a gap in the data, not proof that there is no charger: chargers with lower reliability or a little farther from the road are on the map. Plan to arrive at this stretch with a full battery.

Networks, apps and tolls by country

CountryFast chargersNetworks on the routeRoaming apps listing the countryTolls
Serbia32Charge&GO, Orion eMobility, Tesla, Putevi Srbije—Toll by distance (toll stations or electronic toll). JP Putevi Srbije (checked 09.11.2026)
North Macedonia3ЕВН Македонија—Toll by distance (toll stations or electronic toll). Public Enterprise for State Roads (ЈП за државни патишта) (checked 09.11.2026)

Cost of the trip

CarkWh / 100 kmTrip, EUR
Dacia Spring (LFP 24.3 kWh)13.0€51
Tesla Model Y RWD (Juniper)15.0€59
Kia EV9 99.8 kWh23.5€92

All charging at public DC chargers at the country's DC index price, charging losses not counted. Where a country has no index yet, the European DC average (€0.68) is used: Serbia, North Macedonia.

Winter and summer

In winter the range drops and DC charging is slower with a cold battery: plan shorter steps, precondition the battery before a fast charger if the car can, and arrive at mountain passes with a reserve. In summer, the coast routes are busiest on weekends of July and August: chargers on the motorway can have queues, so a charger a few kilometres off the road can save time.

How this is calculated

The route is a chain of motorway towns; the distance is the straight segments between them plus 15 %, an estimate. Chargers come from the public layer of 09.11.2026: DC 50 kW and more, reliability 70 and more, public access, within 5 km of the route line. No live availability.

Coverage of apps changes often. Before a trip, check the app itself. BlokVolt does not sell charging or cards and takes no money from apps or networks.