Belgrade — Thessaloniki by electric car
About 644 km via Jagodina, Niš, Vranje, Kumanovo, Skopje, Veles, Gevgelija. Fast chargers within 5 km of the road: 56 (of them 150 kW and more: 5).
Suggested stops (at most 150 km apart)
The farthest fast charger within 150 km of the previous stop, the more powerful one when two are close. Kilometres are an estimate along the route. Check the place on the map before you go.
| km | Place | Country | kW | Points | Map |
|---|---|---|---|---|---|
| 145 | Ćuprija · Charge&GO Futura Park Paraćin | Serbia | 120 | 2 | on the map |
| 270 | Leskovac · Charge&GO Stop Shop Leskovac | Serbia | 60 | 3 | on the map |
| 414 | Čair · Porsche Makedonija | North Macedonia | 160 | 2 | on the map |
| 507 | Negotino · ЕВН Македонија EVN | North Macedonia | 150 | 1 | on the map |
Stretches without a fast charger in the data
On this route the data shows a fast charger at least every 150 km.
Networks, apps and tolls by country
| Country | Fast chargers | Networks on the route | Roaming apps listing the country | Tolls |
|---|---|---|---|---|
| Serbia | 32 | Charge&GO, Orion eMobility, Tesla, Putevi Srbije | — | Toll by distance (toll stations or electronic toll). JP Putevi Srbije (checked 09.11.2026) |
| North Macedonia | 5 | ЕВН Македонија, Макпетрол | — | Toll by distance (toll stations or electronic toll). Public Enterprise for State Roads (ЈП за државни патишта) (checked 09.11.2026) |
| Greece | 19 | ElpeFuture, PPC blue, Shell Recharge, NRGincharge | — | Toll by distance (toll stations or electronic toll). Several concessionaires: Attiki Odos, Egnatia Odos, Olympia Odos, Nea Odos/Kentriki Odos, Moreas, Aegean Motorway, Gefyra (Rio-Antirrio) (checked 09.11.2026) |
Cost of the trip
| Car | kWh / 100 km | Trip, EUR |
|---|---|---|
| Dacia Spring (LFP 24.3 kWh) | 13.0 | €57 |
| Tesla Model Y RWD (Juniper) | 15.0 | €66 |
| Kia EV9 99.8 kWh | 23.5 | €103 |
All charging at public DC chargers at the country's DC index price, charging losses not counted. Where a country has no index yet, the European DC average (€0.68) is used: Serbia, North Macedonia, Greece.
Winter and summer
In winter the range drops and DC charging is slower with a cold battery: plan shorter steps, precondition the battery before a fast charger if the car can, and arrive at mountain passes with a reserve. In summer, the coast routes are busiest on weekends of July and August: chargers on the motorway can have queues, so a charger a few kilometres off the road can save time.
How this is calculated
The route is a chain of motorway towns; the distance is the straight segments between them plus 15 %, an estimate. Chargers come from the public layer of 09.11.2026: DC 50 kW and more, reliability 70 and more, public access, within 5 km of the route line. No live availability.
Coverage of apps changes often. Before a trip, check the app itself. BlokVolt does not sell charging or cards and takes no money from apps or networks.