Ljubljana — Split by electric car

About 511 km via Novo mesto, Zagreb, Karlovac, Gospić, Zadar, Šibenik. Fast chargers within 5 km of the road: 55 (of them 150 kW and more: 17).

Data as of 09.11.2026

Suggested stops (at most 150 km apart)

The farthest fast charger within 150 km of the previous stop, the more powerful one when two are close. Kilometres are an estimate along the route. Check the place on the map before you go.

kmPlaceCountrykWPointsMap
145Zagreb · MOON (Porsche Croatia)
Porsche Moon Zagreb
Croatia1503on the map
292Perušić · Tesla Supercharger
Janjče West Supercharger
Croatia2504on the map
404Biograd na Moru · ELEN (HEP)Croatia503on the map

Stretches without a fast charger in the data

On this route the data shows a fast charger at least every 150 km.

Networks, apps and tolls by country

CountryFast chargersNetworks on the routeRoaming apps listing the countryTolls
Slovenia3Petrol, TeslaEnBW mobility+Vignette (time-based) for motorways. DARS d.d. (checked 09.11.2026) The Karawanken tunnel is tolled separately.
Croatia52ELEN (HEP), Petrol, MOL Plugee, Hrvatski Telekom (espoTs)EnBW mobility+Toll by distance (toll stations or electronic toll). Hrvatske autoceste (HAC) (checked 09.11.2026)

Cost of the trip

CarkWh / 100 kmTrip, EUR
Dacia Spring (LFP 24.3 kWh)13.0€35
Tesla Model Y RWD (Juniper)15.0€41
Kia EV9 99.8 kWh23.5€64

All charging at public DC chargers at the country's DC index price, charging losses not counted. Where a country has no index yet, the European DC average (€0.68) is used: every country of the route has an index.

Winter and summer

In winter the range drops and DC charging is slower with a cold battery: plan shorter steps, precondition the battery before a fast charger if the car can, and arrive at mountain passes with a reserve. In summer, the coast routes are busiest on weekends of July and August: chargers on the motorway can have queues, so a charger a few kilometres off the road can save time.

How this is calculated

The route is a chain of motorway towns; the distance is the straight segments between them plus 15 %, an estimate. Chargers come from the public layer of 09.11.2026: DC 50 kW and more, reliability 70 and more, public access, within 5 km of the route line. No live availability.

Coverage of apps changes often. Before a trip, check the app itself. BlokVolt does not sell charging or cards and takes no money from apps or networks.