EV charging stations in Baiersbronn, Germany

Data as of 12.11.2026

charging places30
of them public24
public with fast charging (50 kW+)3
known networks9

On the map: 30 charging places from open sources, 24 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 3 locations (13%); 150 kW or more: 3 locations.

38% of the locations are confirmed by two or more sources; 96% were last confirmed in 2025 or 2026.

Without a known network: 13 locations.

Fast DC chargers from 50 kW per 10 public locations: 1.2 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
bft BaiersbronnNetwork not known300CCS2×209.2026
MineraMinera150CCS2×209.2026
Murgtalstraße 25EnBW150CCS2×410.2026

AC chargers: 19. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

NetworkLocations
deer3
EnBW1
Minera · on the map1
Pluq1
RegioLaden1
SCHARR1
Wattif1
Wirelane1
ladenetz.de1

Locations by maximum power

PowerLocationsShare
AC 11–22 kW1979%
DC under 50 kW28%
150 kW and more313%

Connectors

ConnectorLocations
Type 221
CCS25

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.