EV charging stations in Horb am Neckar, Germany

Data as of 12.11.2026

charging places57
of them public54
public with fast charging (50 kW+)11
known networks15

On the map: 57 charging places from open sources, 54 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 11 locations (20%); 150 kW or more: 7 locations.

41% of the locations are confirmed by two or more sources; 98% were last confirmed in 2025 or 2026.

Without a known network: 15 locations.

Fast DC chargers from 50 kW per 10 public locations: 2.0 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
EnBW-LadestationEnBW400CCS2×2010.2026
10026931_EmpfingenShell Recharge300CCS2×209.2026
AllegoAllego300CCS2×209.2026
Aral Pulsebp pulse300CCS2×809.2026
Aral Pulsebp pulse300CCS2×4, CHAdeMO×209.2026
EWE Go GmbHEWE Go150CCS2×210.2026
Pfalzwerke AGPfalzwerke150CCS2×209.2026
No name in the dataEnBW100CCS2×4—
Team-Emobility GmbHTeam Emobility50Type 2×11, CCS209.2026
Team-Emobility GmbHTeam Emobility50Type 2×14, CCS2×309.2026
No name in the dataNetwork not known50CCS2, Type 209.2026

AC chargers: 41. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC 11–22 kW4176%
DC under 50 kW24%
DC 50–149 kW47%
150 kW and more713%

Connectors

ConnectorLocations
Type 246
CCS213
Schuko5
CHAdeMO2

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.