Be Energised charging stations in Germany

Data as of 12.11.2026

charging places79
of them public74
public with fast charging (50 kW+)6
known networks1

On the map: 79 charging places from open sources, 74 of them public. Not every charger that exists; places with reliability below 40 are not included.

The network is present in 54 cities in Germany; it is <1% of the public locations of the country shown here.

Fast DC charging from 50 kW: 6 locations (8%); 150 kW or more: 1 location.

99% of the locations are confirmed by two or more sources; 91% were last confirmed in 2025 or 2026.

Locations by maximum power

PowerLocationsShare
AC up to 7 kW11%
AC 11–22 kW6689%
DC under 50 kW11%
DC 50–149 kW57%
150 kW and more11%

Connectors

ConnectorLocations
Type 271
CCS27
CHAdeMO3
CEE1
Schuko1

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.