EV charging stations in Hanover, Germany
On the map: 388 charging places from open sources, 361 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 53 locations (15%); 150 kW or more: 30 locations.
64% of the locations are confirmed by two or more sources; 99% were last confirmed in 2025 or 2026.
Without a known network: 12 locations.
Fast DC chargers from 50 kW per 10 public locations: 1.5 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Electra Germany GmbH | Electra | 400 | CCS2×14 | 10.2026 |
| Allego | Allego | 300 | CCS2×4 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×2, CHAdeMO | 10.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| E.ON Drive GmbH | E.ON | 300 | CCS2×2, Type 2×2 | 09.2026 |
| EWE Go GmbH | EWE Go | 300 | CCS2×6 | 10.2026 |
| Jolt Energy GmbH | Jolt | 300 | CCS2×2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 300 | CCS2×6, Type 2×2 | 09.2026 |
| amperio GmbH (DEAMP) | amperio | 300 | CCS2×2 | 09.2026 |
| No name in the data | EnBW | 300 | CCS2×4 | 09.2026 |
| No name in the data | Shell Recharge | 300 | CCS2×4 | 09.2026 |
| enercity AG | enercity | 200 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Comfort Charge | Comfortcharge | 150 | Type 2×2, CCS2, CHAdeMO | 09.2026 |
| EWE Go GmbH | EWE Go | 150 | CCS2×2 | 10.2026 |
| EWE Go GmbH | innogy | 150 | CCS2×2 | 10.2026 |
| enercity AG | Plugsurfing | 150 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 150 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 150 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 150 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 150 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 150 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 150 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 150 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 150 | CCS2×2 | 09.2026 |
| No name in the data | Shell Recharge | 150 | CCS2×2 | 09.2026 |
| TUI AG - TUI Campus | Network not known | 75 | Type 2×40, CCS2×2, CHAdeMO | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | Shell Recharge | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | Plugsurfing | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| enercity AG | enercity | 75 | CCS2×2 | 09.2026 |
| Kaufland | Kaufland | 60 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| Kaufland | Kaufland | 60 | CCS2×2, Type 2 | 09.2026 |
| Lidl | Lidl | 50 | CCS2, Type 2 | 09.2026 |
| Wirelane GmbH | Wirelane | 50 | CCS2×4 | 09.2026 |
Showing 50 of 53 fast chargers; the map shows all.
AC chargers: 306. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| enercity | 273 |
| Plugsurfing | 24 |
| Shell Recharge | 6 |
| Allego | 5 |
| Compleo | 3 |
| bp pulse | 3 |
| Be Energised | 2 |
| ChargePoint | 2 |
| EDEKA | 2 |
| EWE Go | 2 |
| GLS Mobility | 2 |
| innogy | 2 |
| Kaufland | 2 |
| Lidl | 2 |
| Pfalzwerke | 2 |
| Wirelane | 2 |
| APCOA · on the map | 1 |
| CUBOS | 1 |
| ChargeIT mobility | 1 |
| Comfortcharge | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 23 | 6% |
| AC 11–22 kW | 283 | 78% |
| DC under 50 kW | 1 | <1% |
| DC 50–149 kW | 23 | 6% |
| 150 kW and more | 30 | 8% |
| Power not stated | 1 | <1% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 316 |
| CCS2 | 54 |
| CHAdeMO | 7 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.