EV charging stations in Frankenberg (Eder), Germany

Data as of 12.11.2026

charging places48
of them public43
public with fast charging (50 kW+)12
known networks14

On the map: 48 charging places from open sources, 43 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 12 locations (28%); 150 kW or more: 9 locations.

65% of the locations are confirmed by two or more sources; 98% were last confirmed in 2025 or 2026.

Without a known network: 10 locations.

Fast DC chargers from 50 kW per 10 public locations: 2.8 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
EnBW-LadestationEnBW300CCS2×410.2026
No name in the dataEnBW300CCS2×409.2026
No name in the dataNetwork not known300CCS2×209.2026
EnBW-LadestationEnBW200CCS2×410.2026
No name in the dataStadtwerke Frankenberg200CCS2×209.2026
EWE Go GmbHEWE Go160CCS2×210.2026
Frankenberg (Eder) - HERKULESTEAG150CCS2×410.2026
Gemünden TankstelleE-Merge Mobility150CCS2×209.2026
No name in the dataStadtwerke Frankenberg150CCS2×209.2026
Burgwald - EDEKATEAG50CCS2×210.2026
Frankenau - EDEKATEAG50CCS2×210.2026
Frankenberg, Hans-Viessmann-SchuleE-Merge Mobility50CCS2×209.2026

AC chargers: 30. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC 11–22 kW3070%
DC 50–149 kW37%
150 kW and more921%
Power not stated12%

Connectors

ConnectorLocations
Type 230
CCS212
Schuko1

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.