EV charging stations in Meschede, Germany

Data as of 12.11.2026

charging places31
of them public26
public with fast charging (50 kW+)5
known networks8

On the map: 31 charging places from open sources, 26 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 5 locations (19%); 150 kW or more: 2 locations.

62% of the locations are confirmed by two or more sources; 96% were last confirmed in 2025 or 2026.

Without a known network: 9 locations.

Fast DC chargers from 50 kW per 10 public locations: 1.9 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Westfalen Weser Ladeservice GmbHWestfalen Weser Netz200CCS2×209.2026
amperio GmbH (DEAMP)amperio150CCS2×809.2026
Westenergie Metering GmbHWestenergie100CCS2×209.2026
AllegoAllego50CCS2, CHAdeMO, Type 209.2026
AllegoAllego50CCS2, CHAdeMO, Type 209.2026

AC chargers: 20. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC 11–22 kW2077%
DC 50–149 kW312%
150 kW and more28%
Power not stated14%

Connectors

ConnectorLocations
Type 222
CCS25
CHAdeMO2

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.