MENNEKES charging stations in Germany
On the map: 112 charging places from open sources, 39 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 33 cities in Germany; it is <1% of the public locations of the country shown here.
Fast DC charging from 50 kW: 0 locations (0%); 150 kW or more: 0 locations.
82% of the locations are confirmed by two or more sources; 74% were last confirmed in 2025 or 2026.
Cities
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 34 | 87% |
| DC under 50 kW | 1 | 3% |
| AC, power not stated | 1 | 3% |
| Power not stated | 3 | 8% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 36 |
| Schuko | 3 |
| CCS2 | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.