EV charging stations in Trier, Germany
On the map: 140 charging places from open sources, 116 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 34 locations (29%); 150 kW or more: 26 locations.
62% of the locations are confirmed by two or more sources; 99% were last confirmed in 2025 or 2026.
Without a known network: 23 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.9 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| EWE Go GmbH | EWE Go | 400 | CCS2×2 | 10.2026 |
| Stadtwerke Trier | Stadtwerke Trier | 400 | CCS2×8 | 09.2026 |
| TotalEnergies Charging Solutions | TotalEnergies | 400 | CCS2×6 | 10.2026 |
| 10024288_Trier | Shell Recharge | 300 | CCS2×4 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4 | 10.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×6 | 09.2026 |
| EnBW-Ladestation | EnBW | 300 | CCS2×4 | 10.2026 |
| EnBW-Ladestation | EnBW | 300 | CCS2×4, Type 2 | 10.2026 |
| Kiemstr. Ladesäule 2 | Network not known | 300 | CCS2×2 | 09.2026 |
| MoselCharge | Network not known | 300 | CCS2×2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 300 | CCS2×2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 300 | CCS2×2 | 09.2026 |
| REWE Welschbillig, Auf den Ritten | EnBW | 300 | CCS2×4 | 09.2026 |
| SSS Energie- und Netztechnik | Network not known | 300 | CCS2×2 | 09.2026 |
| No name in the data | Tesla | 250 | CCS2×8 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 200 | CCS2×2 | 09.2026 |
| REWE Bitburg, Saarstraße 46 | EnBW | 200 | CCS2×4 | 09.2026 |
| TotalEnergies Charging Solutions | TotalEnergies | 200 | CCS2×6 | 09.2026 |
| Citywatt GmbH | Citywatt | 180 | CCS2×2 | 09.2026 |
| Pfalzwerke AG | Stadtwerke Trier | 160 | CCS2×2 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Shell | Shell Recharge | 150 | CCS2×2 | 09.2026 |
| Stadtwerke Trier | Stadtwerke Trier | 150 | CCS2×2 | 09.2026 |
| Stadtwerke Trier | Stadtwerke Trier | 150 | CCS2×4 | 09.2026 |
| Stadtwerke Trier | Stadtwerke Trier | 150 | CCS2×2 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 100 | CCS2×2, Type 2 | 09.2026 |
| E.ON Drive GmbH | innogy | 75 | CCS2×4 | 09.2026 |
| EWE Go GmbH | EWE Go | 75 | CCS2×2 | 10.2026 |
| Kaufland | Kaufland | 60 | CCS2×2, Type 2 | 09.2026 |
| Lidl | Lidl | 60 | CCS2×2, Type 2 | 09.2026 |
| MER Germany | E-Wald | 50 | CCS2, Type 2 | 10.2026 |
| Westenergie Metering GmbH | Westenergie | 50 | CCS2, Type 2 | 09.2026 |
| No name in the data | Network not known | 50 | CCS2, Type 2 | 09.2026 |
AC chargers: 81. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Stadtwerke Trier | 25 |
| innogy | 14 |
| Westenergie | 11 |
| ladenetz.de | 7 |
| ALDI SÜD | 5 |
| EnBW | 4 |
| GLS Mobility | 3 |
| Citywatt | 2 |
| EWE Go | 2 |
| Pfalzwerke | 2 |
| Shell Recharge | 2 |
| TotalEnergies | 2 |
| bp pulse | 2 |
| Allego | 1 |
| Cloppenburg · on the map | 1 |
| E-Wald | 1 |
| E.ON | 1 |
| GETEC mobility solutions | 1 |
| Hymes Energy · on the map | 1 |
| Kaufland | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 3 | 3% |
| AC 11–22 kW | 78 | 67% |
| DC under 50 kW | 1 | 1% |
| DC 50–149 kW | 8 | 7% |
| 150 kW and more | 26 | 22% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 88 |
| CCS2 | 35 |
| Schuko | 10 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.