EV charging stations in Goirle, Netherlands
On the map: 241 charging places from open sources, 203 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 2 locations (1%); 150 kW or more: 0 locations.
39% of the locations are confirmed by two or more sources; 99% were last confirmed in 2025 or 2026.
Without a known network: 1 location.
Fast DC chargers from 50 kW per 10 public locations: 0.1 here, 0.2 on average across Netherlands.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| First Impression (PowerGo) | PowerGo | 90 | CCS2×2 | 11.2026 |
| Mina Krusemanweg | Vattenfall InCharge | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
AC chargers: 198. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 2 | 1% |
| AC 11–22 kW | 196 | 97% |
| DC under 50 kW | 1 | <1% |
| DC 50–149 kW | 2 | 1% |
| Power not stated | 2 | 1% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 198 |
| CCS2 | 3 |
| CEE | 2 |
| CHAdeMO | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.