Den Hartog Charging charging stations in the Netherlands
On the map: 152 charging places from open sources, 152 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 44 cities in the Netherlands; it is <1% of the public locations of the country shown here.
Fast DC charging from 50 kW: 6 locations (4%); 150 kW or more: 6 locations.
20% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Cities
| City | Locations |
|---|---|
| Sliedrecht | 32 |
| Gorinchem | 21 |
| Dordrecht | 13 |
| Leiden | 12 |
| Papendrecht | 11 |
| Lisse | 8 |
| Alblasserdam | 7 |
| Oegstgeest | 4 |
| Leiderdorp | 4 |
| Wijk bij Duurstede | 3 |
| Kampen | 3 |
| Venlo | 2 |
| Zwolle | 1 |
| Zwijndrecht | 1 |
| Zeist | 1 |
| Zaltbommel | 1 |
| Wisch | 1 |
| Voorschoten | 1 |
| Voorburg | 1 |
| Utrecht | 1 |
| Uithoorn | 1 |
| Sittard | 1 |
| 's-Hertogenbosch | 1 |
| Rhenen | 1 |
| Oosterhout | 1 |
| Naaldwijk | 1 |
| Middelharnis | 1 |
| Katwijk aan Zee | 1 |
| IJsselstein | 1 |
| Hoogeveen | 1 |
| Hengelo | 1 |
| Heerhugowaard | 1 |
| Harderwijk | 1 |
| Goes | 1 |
| Gemert | 1 |
| Eindhoven | 1 |
| Driebergen-Rijsenburg | 1 |
| Dongen | 1 |
| Delft | 1 |
| Dalfsen | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 145 | 95% |
| DC under 50 kW | 1 | 1% |
| 150 kW and more | 6 | 4% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 148 |
| CCS2 | 6 |
| CHAdeMO | 2 |
| CCS1 | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.