EV charging stations in Zeist, Netherlands
On the map: 313 charging places from open sources, 205 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 7 locations (3%); 150 kW or more: 4 locations.
37% of the locations are confirmed by two or more sources; 83% were last confirmed in 2025 or 2026.
Without a known network: 5 locations.
Fast DC chargers from 50 kW per 10 public locations: 0.3 here, 0.2 on average across Netherlands.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Allego - Postillion Hotel Bunnik A12 | Tesla | 400 | Type 2×10, CCS2×8 | 11.2026 |
| Allego - Van der Valk De Bilt-Utrecht | GreenFlux | 300 | CCS2×6, Type 2×6 | 11.2026 |
| Fastned De Forten | MisterGreen, The Fast Charger Network | 300 | CCS2×10, CHAdeMO×3 | 11.2026 |
| Shell Recharge NL9201 - Gamma Zeist | Den Hartog Charging | 150 | CCS2×4 | 11.2026 |
| E.ON Drive Public Netherlands AH, Prinses Marijkelaan 9200, Zeist | E.ON | 50 | CCS2×4 | 11.2026 |
| Eneco eMobility Albert Heijn - Herenweg 8 | Eneco | 50 | CCS2 | 11.2026 |
| Station Werkplaats Kindergemeenschap | E-Flux | 50 | Type 2×4, CCS2, CHAdeMO | 11.2026 |
AC chargers: 154. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| TotalEnergies | 41 |
| 50five | 35 |
| Vattenfall InCharge | 34 |
| Equans | 23 |
| ubitricity | 21 |
| E-Flux | 10 |
| Eneco | 6 |
| Shell Recharge | 6 |
| Laadnet | 4 |
| IP Charging | 3 |
| Pluq | 3 |
| Greenchoice · on the map | 2 |
| PowerGo | 2 |
| Tesla | 2 |
| Allego | 1 |
| DAEN Mobility | 1 |
| Den Hartog Charging | 1 |
| E.ON · on the map | 1 |
| GreenFlux | 1 |
| MisterGreen, The Fast Charger Network · on the map | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 30 | 15% |
| AC 11–22 kW | 122 | 60% |
| DC under 50 kW | 1 | <1% |
| DC 50–149 kW | 3 | 1% |
| 150 kW and more | 4 | 2% |
| AC, power not stated | 2 | 1% |
| Power not stated | 43 | 21% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 157 |
| CCS2 | 8 |
| CHAdeMO | 2 |
| Schuko | 1 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.