Ecotap charging stations in the Netherlands
On the map: 83 charging places from open sources, 30 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 22 cities in the Netherlands; it is <1% of the public locations of the country shown here.
Fast DC charging from 50 kW: 3 locations (10%); 150 kW or more: 1 location.
33% of the locations are confirmed by two or more sources; 20% were last confirmed in 2025 or 2026.
Cities
| City | Locations |
|---|---|
| Utrecht | 4 |
| Schiedam | 4 |
| Zoetermeer | 2 |
| Bergen op Zoom | 2 |
| Zutphen | 1 |
| Weesp | 1 |
| Wageningen | 1 |
| Voorburg | 1 |
| Terneuzen | 1 |
| Spijkenisse | 1 |
| Roosendaal | 1 |
| Rijswijk | 1 |
| Oud-Beijerland | 1 |
| Oss | 1 |
| Maastricht | 1 |
| Maarssen | 1 |
| Lisse | 1 |
| Leek | 1 |
| Goes | 1 |
| Den Helder | 1 |
| Delft | 1 |
| Capelle aan den IJssel | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 15 | 50% |
| DC 50–149 kW | 2 | 7% |
| 150 kW and more | 1 | 3% |
| AC, power not stated | 8 | 27% |
| DC, power not stated | 1 | 3% |
| Power not stated | 3 | 10% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 21 |
| CCS2 | 4 |
| Schuko | 3 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.