EV charging stations in Zutphen, Netherlands
On the map: 265 charging places from open sources, 254 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 4 locations (2%); 150 kW or more: 1 location.
32% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Fast DC chargers from 50 kW per 10 public locations: 0.2 here, 0.2 on average across Netherlands.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Eneco eMobility Albert Heijn - Polsbroek 77 | Eneco | 150 | CCS2×4 | 11.2026 |
| Industrieweg 90, Zutphen (VARO) | Ecotap | 60 | Type 2×8, CCS2 | 11.2026 |
| Lidl LOCHEM | Lidl | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
| Vattenfall InCharge | Vattenfall InCharge | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
AC chargers: 250. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Vattenfall InCharge | 136 |
| Allego | 57 |
| 50five | 22 |
| E-Flux | 15 |
| Laadnet | 5 |
| Pluq | 5 |
| Equans | 4 |
| Eneco | 3 |
| Lidl | 2 |
| EVnetNL | 1 |
| Ecotap | 1 |
| Fleet Charge Services | 1 |
| Lanova Laadpalen | 1 |
| Qwello | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 3 | 1% |
| AC 11–22 kW | 247 | 97% |
| DC 50–149 kW | 3 | 1% |
| 150 kW and more | 1 | <1% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 253 |
| CCS2 | 4 |
| CHAdeMO | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.