EV charging stations in Urk, Netherlands
On the map: 34 charging places from open sources, 33 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 2 locations (6%); 150 kW or more: 2 locations.
27% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Fast DC chargers from 50 kW per 10 public locations: 0.6 here, 0.2 on average across Netherlands.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Fastned Han Stijkel | Fastned | 400 | CCS2×8, CHAdeMO×2 | 11.2026 |
| Fastned De Abt | Allego | 150 | CCS2×2, CHAdeMO | 11.2026 |
AC chargers: 31. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| E-Flux | 10 |
| Laadnet | 7 |
| Vattenfall InCharge | 5 |
| ubitricity | 4 |
| Eneco | 2 |
| 50five | 1 |
| Allego | 1 |
| Fastned | 1 |
| OpCharge | 1 |
| Pluq | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 31 | 94% |
| 150 kW and more | 2 | 6% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 31 |
| CCS2 | 2 |
| CHAdeMO | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.