EV charging stations in Barakaldo, Spain

Data as of 12.11.2026

charging places21
of them public17
public with fast charging (50 kW+)6
known networks10

On the map: 21 charging places from open sources, 17 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 6 locations (35%); 150 kW or more: 1 location.

76% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.

Without a known network: 2 locations.

Fast DC chargers from 50 kW per 10 public locations: 3.5 here, 4.2 on average across Spain.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Barakaldo, Spain - MegaParkTesla250CCS2×1611.2026
Ibis - BarakaldoPowerdot100CCS2×411.2026
ESTACIÓN DE SERVICIO NAFTE BARAKALDONetwork not known60CCS211.2026
BI-Barakaldo-002Iberdrola | bp pulse50CCS2×2, CHAdeMO×2, Type 2×211.2026
BI-Barakaldo-012Iberdrola | bp pulse50CCS2, CHAdeMO11.2026
Repsol ES, CRED IbarretaRepsol50CCS2, CHAdeMO, Type 211.2026

AC chargers: 11. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC up to 7 kW529%
AC 11–22 kW635%
DC 50–149 kW529%
150 kW and more16%

Connectors

ConnectorLocations
Type 213
CCS26
CHAdeMO3
Schuko1

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.