Acciona charging stations in Spain
On the map: 436 charging places from open sources, 414 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 158 cities in Spain; it is 3% of the public locations of the country shown here.
Fast DC charging from 50 kW: 296 locations (71%); 150 kW or more: 20 locations.
86% of the locations are confirmed by two or more sources; 96% were last confirmed in 2025 or 2026.
Cities
| City | Locations |
|---|---|
| Seville | 63 |
| Bilbao | 7 |
| Bormujos | 6 |
| Alcantarilla | 6 |
| Lugo | 6 |
| Mairena del Aljarafe | 5 |
| Córdoba | 5 |
| Bailén | 5 |
| Vila-seca | 5 |
| Valladolid | 5 |
| Talavera de la Reina | 4 |
| San Juan de Aznalfarache | 4 |
| Santiago de Compostela | 4 |
| Sama | 4 |
| Lleida | 4 |
| Laguna de Duero | 4 |
| Alcorcón | 4 |
| Valdepeñas | 3 |
| Toledo | 3 |
| Maracena | 3 |
| Guadix | 3 |
| Campo de Criptana | 3 |
| Zamora | 3 |
| Sanxenxo | 3 |
| Pamplona | 3 |
| Palencia | 3 |
| Miranda de Ebro | 3 |
| Manresa | 3 |
| Alcobendas | 3 |
| Montilla | 2 |
| Molina de Segura | 2 |
| Mérida | 2 |
| Manzanares | 2 |
| Malaga | 2 |
| Xàtiva | 2 |
| Ciudad Real | 2 |
| Chiclana de la Frontera | 2 |
| Camas | 2 |
| Cádiz | 2 |
| Atarfe · on the map | 2 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 12 | 3% |
| AC 11–22 kW | 95 | 23% |
| DC under 50 kW | 11 | 3% |
| DC 50–149 kW | 276 | 67% |
| 150 kW and more | 20 | 5% |
Connectors
| Connector | Locations |
|---|---|
| CCS2 | 307 |
| Type 2 | 280 |
| CHAdeMO | 155 |
| Schuko | 4 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.