EV charging stations in Olten, Switzerland
On the map: 78 charging places from open sources, 33 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 16 locations (48%); 150 kW or more: 13 locations.
64% of the locations are confirmed by two or more sources; 45% were last confirmed in 2025 or 2026.
Without a known network: 11 locations.
Fast DC chargers from 50 kW per 10 public locations: 4.8 here, 2.1 on average across Switzerland.
Open data cover only part of the chargers here. Source
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| IONITY Oftringen | IONITY | 350 | CCS2×12 | 10.2026 |
| Migrol Roggwil | M-Charge | 320 | CCS2×4 | — |
| GOFAST Langenthal | GOFAST | 300 | Type 2×2, CCS2 | — |
| GOFAST Oensingen | GOFAST | 300 | CCS2×8, Type 2×2, CHAdeMO, Tesla (NACS) | — |
| GOFAST Schötz | GOFAST | 300 | CCS2 | — |
| PowerUp | Agrola | 165 | CCS2×2, CHAdeMO | 10.2026 |
| Egerkingen Supercharger | Tesla | 150 | CCS2×20, Tesla (NACS)×10 | 03.2019 |
| GOFAST Gunzgen Süd | GOFAST | 150 | CCS2×2, CHAdeMO, Tesla (NACS), Type 2 | 10.2019 |
| GOFAST Oftringen | GOFAST | 150 | CCS2×8, CHAdeMO×2, Type 2 | 11.2026 |
| GOFAST Rothrist | GOFAST | 150 | CHAdeMO, Type 2, CCS2 | — |
| GOFAST Walterswil | GOFAST | 150 | CCS2×7, CHAdeMO, Type 2 | 11.2026 |
| Rastplatz Mühlematt West | MOVE | 150 | CCS2 | 10.2026 |
| Rastplatz Teufenbach | Swisscharge | 150 | CCS2×2, CHAdeMO, Type 2 | 10.2026 |
| Oftringen Supercharger | Tesla | 125 | CCS2×28, Tesla (NACS)×14 | 10.2026 |
| Migrol Charging Station | Migrol | 120 | CHAdeMO, Type 2 | 11.2026 |
| GOFAST Gunzgen Nord | GOFAST | 60 | CHAdeMO, Type 2, CCS2 | 10.2019 |
AC chargers: 12. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 3% |
| AC 11–22 kW | 10 | 30% |
| DC under 50 kW | 2 | 6% |
| DC 50–149 kW | 3 | 9% |
| 150 kW and more | 13 | 39% |
| AC, power not stated | 1 | 3% |
| Power not stated | 3 | 9% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 22 |
| CCS2 | 16 |
| CHAdeMO | 10 |
| Tesla (NACS) | 4 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.