EV charging stations in Amherst Center, United States
On the map: 26 charging places from open sources, 26 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 1 location (4%); 150 kW or more: 0 locations.
81% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Fast DC chargers from 50 kW per 10 public locations: 0.4 here, 2.1 on average across United States.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| AMHERST PUBLIC LOT 1 | ChargePoint | 62 | CCS1, Tesla (NACS) | 11.2026 |
AC chargers: 25. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| ChargePoint | 25 |
| SWTCH | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 25 | 96% |
| DC 50–149 kW | 1 | 4% |
Connectors
| Connector | Locations |
|---|---|
| Type 1 | 25 |
| CCS1 | 1 |
| Tesla (NACS) | 1 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.