EV charging stations in Bloomington, United States (near Fontana)
On the map: 11 charging places from open sources, 10 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 2 locations (20%); 150 kW or more: 1 location.
80% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 1 location.
Fast DC chargers from 50 kW per 10 public locations: 2.0 here, 2.1 on average across United States.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Rialto Village | EVgo | 350 | CCS1×8 | 11.2026 |
| Rialto Marketplace | EVgo | 50 | CHAdeMO×2, CCS1×2 | 12.2025 |
AC chargers: 8. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| ChargePoint | 4 |
| EVgo | 2 |
| EVGateway | 1 |
| FLASH | 1 |
| Loop | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 5 | 50% |
| AC 11–22 kW | 3 | 30% |
| DC 50–149 kW | 1 | 10% |
| 150 kW and more | 1 | 10% |
Connectors
| Connector | Locations |
|---|---|
| Type 1 | 8 |
| CCS1 | 2 |
| CHAdeMO | 1 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.