EV charging stations in Edina, United States
On the map: 31 charging places from open sources, 30 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 1 location (3%); 150 kW or more: 1 location.
90% of the locations are confirmed by two or more sources; 97% were last confirmed in 2025 or 2026.
Fast DC chargers from 50 kW per 10 public locations: 0.3 here, 2.1 on average across United States.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Target T2313 (Edina, MN) | Electrify America | 350 | CCS1×6 | 11.2026 |
AC chargers: 29. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| ChargePoint | 15 |
| Blink | 7 |
| Tesla | 4 |
| SemaConnect | 2 |
| Electrify America | 1 |
| ZEF Energy | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 21 | 70% |
| AC 11–22 kW | 8 | 27% |
| 150 kW and more | 1 | 3% |
Connectors
| Connector | Locations |
|---|---|
| Type 1 | 27 |
| Tesla (NACS) | 6 |
| CCS1 | 1 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.