EV charging stations in Mountain View, United States

Data as of 12.11.2026

charging places74
of them public49
public with fast charging (50 kW+)8
known networks9

On the map: 74 charging places from open sources, 49 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 8 locations (16%); 150 kW or more: 5 locations.

71% of the locations are confirmed by two or more sources; 90% were last confirmed in 2025 or 2026.

Without a known network: 1 location.

Fast DC chargers from 50 kW per 10 public locations: 1.6 here, 2.1 on average across United States.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
East Middlefield RoadEVgo350CCS1×8, CHAdeMO×811.2026
Monta Loma PlazaEVgo350CCS1×611.2026
Mountain View, CA - El Monte Avenue - Tesla SuperchargerTesla325Tesla (NACS)×1211.2026
Mountain View, CA - Grant Road - Tesla SuperchargerTesla250Tesla (NACS)×3211.2026
Mountain View, CA - Tesla SuperchargerTesla150Tesla (NACS)×1211.2026
790 E El Camino RealEV Connect50CCS1×202.2024
Ames Visitor CenterChargePoint50CCS1×8, CHAdeMO×811.2026
Chevron Mountain ViewEV Connect50CHAdeMO, CCS102.2024

AC chargers: 40. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

Locations by maximum power

PowerLocationsShare
AC up to 7 kW3469%
AC 11–22 kW612%
DC under 50 kW12%
DC 50–149 kW36%
150 kW and more510%

Connectors

ConnectorLocations
Type 139
CCS16
Tesla (NACS)5
CHAdeMO4

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.