EV charging stations in Murfreesboro, United States
On the map: 32 charging places from open sources, 22 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 3 locations (14%); 150 kW or more: 2 locations.
91% of the locations are confirmed by two or more sources; 95% were last confirmed in 2025 or 2026.
Without a known network: 2 locations.
Fast DC chargers from 50 kW per 10 public locations: 1.4 here, 2.1 on average across United States.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Murfreesboro, TN - Tesla Supercharger | Tesla | 325 | Tesla (NACS)×12 | 11.2026 |
| Electric Era Charging Station | Electric Era | 200 | CCS1×5, Tesla (NACS)×3 | 11.2026 |
| Nissan of Murfreesboro | Network not known | 50 | Type 1, CHAdeMO, CCS1 | 11.2025 |
AC chargers: 19. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Blink | 10 |
| ChargePoint | 5 |
| Tesla | 2 |
| ABM | 1 |
| Electric Era | 1 |
| Loop | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 5 | 23% |
| AC 11–22 kW | 14 | 64% |
| DC 50–149 kW | 1 | 5% |
| 150 kW and more | 2 | 9% |
Connectors
| Connector | Locations |
|---|---|
| Type 1 | 19 |
| Tesla (NACS) | 3 |
| CCS1 | 2 |
| CHAdeMO | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.