EV charging stations in Norcross, United States

Data as of 12.11.2026

charging places11
of them public11
public with fast charging (50 kW+)3
known networks5

On the map: 11 charging places from open sources, 11 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 3 locations (27%); 150 kW or more: 2 locations.

73% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.

Without a known network: 1 location.

Fast DC chargers from 50 kW per 10 public locations: 2.7 here, 2.1 on average across United States.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Carter Oak CrossingEVgo350CCS1×4, CHAdeMO×211.2026
Target Peachtree Corners #T0982EVgo350CCS1×4, CHAdeMO×211.2026
GEORGIA POWER NORCROSS DC2ChargePoint125CCS1, CHAdeMO11.2026

AC chargers: 7. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

NetworkLocations
ChargePoint3
Blink2
EVgo2
Tesla2
OpConnect1

Locations by maximum power

PowerLocationsShare
AC up to 7 kW436%
AC 11–22 kW327%
DC 50–149 kW19%
150 kW and more218%
Power not stated19%

Connectors

ConnectorLocations
Type 18
CCS13
CHAdeMO3
Tesla (NACS)2

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.