EV charging stations in Sierra Vista, United States

Data as of 12.11.2026

charging places12
of them public11
public with fast charging (50 kW+)5
known networks3

On the map: 12 charging places from open sources, 11 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 5 locations (45%); 150 kW or more: 0 locations.

82% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.

Without a known network: 1 location.

Fast DC chargers from 50 kW per 10 public locations: 4.5 here, 2.1 on average across United States.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Sports ComplexEV Connect100CCS1, CHAdeMO11.2026
COCHISE COUNTY SIERRA VISTA L3ChargePoint62CCS1, CHAdeMO11.2026
Cyr ParkEV Connect50Type 1×2, CCS1, CHAdeMO11.2026
Public LibraryEV Connect50Type 1×2, CCS1, CHAdeMO11.2026
Stone FieldEV Connect50Type 1×2, CCS1, CHAdeMO11.2026

AC chargers: 6. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

NetworkLocations
EV Connect5
ChargePoint3
Tesla2

Locations by maximum power

PowerLocationsShare
AC up to 7 kW436%
AC 11–22 kW218%
DC 50–149 kW545%

Connectors

ConnectorLocations
Type 18
CCS15
CHAdeMO5
Tesla (NACS)2

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.