EV charging stations in Waterville, United States

Data as of 12.11.2026

charging places17
of them public17
public with fast charging (50 kW+)3
known networks4

On the map: 17 charging places from open sources, 17 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 3 locations (18%); 150 kW or more: 1 location.

76% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.

Without a known network: 5 locations.

Fast DC chargers from 50 kW per 10 public locations: 1.8 here, 2.1 on average across United States.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Waterville, ME - Tesla SuperchargerTesla250Tesla (NACS)×1211.2026
IRVINGOIL ME-FFLD-L3-0002ChargePoint102CCS1, CHAdeMO11.2026
Hight Chevrolet-Buick-GMCEV Connect50CCS106.2025

AC chargers: 14. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

NetworkLocations
ChargePoint8
Blink2
EV Connect1
Tesla1

Locations by maximum power

PowerLocationsShare
AC up to 7 kW1271%
AC 11–22 kW212%
DC 50–149 kW212%
150 kW and more16%

Connectors

ConnectorLocations
Type 114
CCS12
CHAdeMO1
Tesla (NACS)1
NEMA1

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.