EV charging stations in Bremen, Germany
On the map: 231 charging places from open sources, 215 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 52 locations (24%); 150 kW or more: 29 locations.
55% of the locations are confirmed by two or more sources; 98% were last confirmed in 2025 or 2026.
Without a known network: 31 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.4 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| 28277 Bremen, Hermann-Entholt-Straße | EnBW | 400 | CCS2×8 | 09.2026 |
| EWE Go GmbH | Allego | 400 | CCS2×4 | 10.2026 |
| EWE Go GmbH | EWE Go | 400 | CCS2×2 | 10.2026 |
| Habichthorst Rifa Nord Ost | Fastned | 400 | CCS2×4 | 09.2026 |
| Habichthorst Rifa Süd West | Fastned | 400 | CCS2×4 | 10.2026 |
| Pfalzwerke AG | Pfalzwerke | 320 | CCS2×2 | 09.2026 |
| AUDI AG | Audi | 300 | CCS2×4 | 09.2026 |
| Allego | Allego | 300 | CCS2×4, Type 2×2 | 09.2026 |
| Allego | Allego | 300 | CCS2×10 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4 | 10.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| CutPower Charging Hub | Chargeforce | 300 | CCS2×8, CHAdeMO | 09.2026 |
| EnBW-Ladestation | EnBW | 300 | CCS2×8, Type 2 | 10.2026 |
| Jolt Energy GmbH | Jolt | 300 | CCS2×2 | 09.2026 |
| reChargeon | Network not known | 300 | CCS2×4, Type 2×2 | 09.2026 |
| Bremen Supercharger | Tesla | 250 | CCS2×8 | 09.2026 |
| BAUHAUS Bremen, Stresemannstr. | EnBW | 200 | CCS2×4 | 10.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| Comfort Charge | Comfortcharge | 150 | Type 2×2, CCS2, CHAdeMO | 09.2026 |
| Comfort Charge | Comfortcharge | 150 | CCS2×2, Type 2 | 09.2026 |
| EA-DD | EA EnergieArchitektur | 150 | CCS2×2, Type 2×2 | 09.2026 |
| EWE Go GmbH | EWE Go | 150 | CCS2×2 | 10.2026 |
| EnBW-Ladestation | EnBW | 150 | CCS2×2 | 10.2026 |
| EWE Go GmbH | EWE Go | 75 | CCS2×2 | 10.2026 |
| MER Germany | Mer | 75 | CCS2×2 | 10.2026 |
| Kaufland | Kaufland | 60 | CCS2×2, Type 2 | 09.2026 |
| Kaufland | Kaufland | 60 | CCS2×2, Type 2 | 09.2026 |
| Lidl | Lidl | 60 | CCS2×2, Type 2 | 09.2026 |
| Lidl | Lidl | 60 | CCS2×2, Type 2 | 09.2026 |
| BS-LIS - Alfred-Faust-Straße 6022, Bremen 28277 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| BS-LIS - Hermine-Berthold-Str. 6006, Bremen 28205 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| BYL-LIS - Auf dem Halm 6023, Bremen 28717 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| BYL-LIS - August-Bebel-Allee 6012, Bremen 28329 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| BYL-LIS - Butjadinger Straße 6016, Bremen 28197 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| BYL-LIS - Schifferstraße 7038, Bremen 28217 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| Edeka Maaß | EWE Go | 50 | CCS2×2 | 09.2026 |
| Lidl | EnBW | 50 | CCS2, CHAdeMO, Type 2 | 10.2026 |
| abc-LIS - Julius Bruhns Straße 6001, Bremen 28329 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| abc-LIS_Friedrich-Karl-Straße 38, 6042 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| abc-LIS_Gottfried-Menken-Straße 2, 6002 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| abc-LIS_Kurt-Schumacher-Allee 71, 8071 | SolarLoader+ | 50 | CCS2×2 | 09.2026 |
| reCHARGEon | reon Infrastruktur | 50 | CCS2×2 | 09.2026 |
| reCHARGEon | reon Infrastruktur | 50 | CCS2×2, Type 2×2 | 09.2026 |
| swb | SWB / EWE | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
Showing 50 of 52 fast chargers; the map shows all.
AC chargers: 153. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| SWB / EWE | 28 |
| Eulektro | 24 |
| EWE Go | 20 |
| Wirelane | 13 |
| Allego | 10 |
| SolarLoader+ | 10 |
| Mercedes-Benz | 9 |
| AH Beteiligungsgesellschaft · on the map | 6 |
| EnBW | 5 |
| R&M Beteiligungsgesellschaft · on the map | 5 |
| reon Infrastruktur · on the map | 5 |
| Ladesonne | 4 |
| Autohaus Neustadt Schmidt + Koch · on the map | 3 |
| GLS Mobility | 3 |
| Osterholzer Stadtwerke · on the map | 3 |
| Wattif | 3 |
| Comfortcharge | 2 |
| Fastned | 2 |
| Kaufland | 2 |
| Lidl | 2 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 153 | 71% |
| DC under 50 kW | 8 | 4% |
| DC 50–149 kW | 23 | 11% |
| 150 kW and more | 29 | 13% |
| Power not stated | 2 | 1% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 173 |
| CCS2 | 59 |
| CHAdeMO | 7 |
| CEE | 1 |
| Type 1 | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.