EV charging stations in Barañáin, Spain
On the map: 43 charging places from open sources, 35 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 16 locations (46%); 150 kW or more: 4 locations.
77% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 4 locations.
Fast DC chargers from 50 kW per 10 public locations: 4.6 here, 4.2 on average across Spain.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| NA-Zizurmayor-001 | Iberdrola | bp pulse | 180 | CCS2×4 | 11.2026 |
| E.leclerc Gas station Zizur | Powerdot | 150 | CCS2×2 | 11.2026 |
| HYC23BZ0196A- | Moeve | 150 | CCS2 | 11.2026 |
| TotalEnergies - Hotel Plazaola | TotalEnergies | 150 | CCS2×2, CHAdeMO, Type 2 | 11.2026 |
| ACCIONA - Legarda Logroño | Acciona | 100 | CCS2×2 | 11.2026 |
| Estación GM Orkoien - La Muga | Iberdrola | bp pulse | 100 | CCS2×2 | 11.2026 |
| Sungrow Pamplona | emovili Fast | 100 | CCS2×3 | 11.2026 |
| Estación de Servicio Orcoyen Agustinos | Eranovum | 60 | CCS2×2 | 11.2026 |
| Gasolinera Avia Puente la Reina (Vilalta) | Vilalta Greenergy | 50 | CCS2, Type 2, CHAdeMO | 11.2025 |
| NA-Campanas-001 | Iberdrola | bp pulse | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
| NA-Orkoien-001 | Iberdrola | bp pulse | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
| NA-Zizurmayor-002 | Iberdrola | bp pulse | 50 | CCS2×2, Type 2×2, CHAdeMO | 11.2026 |
| ORKOIEN | CEL TODA Navarra | 50 | CCS2, Type 2 | 11.2026 |
| Piscinas Cizur Menor (Vilalta) | Vilalta Greenergy | 50 | CCS2, CHAdeMO, Type 2 | 11.2025 |
| Repsol ES, CRED Zuasti | Repsol | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
| TotalEnergies - Camping Aritzaleku | TotalEnergies | 50 | CCS2×2, CHAdeMO×2, Type 2×2 | 11.2026 |
AC chargers: 18. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Iberdrola | bp pulse | 11 |
| eTecnic | 4 |
| CEL TODA Navarra | 2 |
| Repsol | 2 |
| TotalEnergies | 2 |
| Vilalta Greenergy | 2 |
| Acciona | 1 |
| Moeve | 1 |
| Electromaps | 1 |
| Eranovum | 1 |
| Fenie Energía | 1 |
| Mercadona | 1 |
| Powerdot | 1 |
| emovili Fast | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 5 | 14% |
| AC 11–22 kW | 13 | 37% |
| DC under 50 kW | 1 | 3% |
| DC 50–149 kW | 12 | 34% |
| 150 kW and more | 4 | 11% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 28 |
| CCS2 | 17 |
| CHAdeMO | 9 |
| Schuko | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.