Moeve charging stations in Spain
On the map: 89 charging places from open sources, 86 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 65 cities in Spain; it is 1% of the public locations of the country shown here.
Fast DC charging from 50 kW: 85 locations (99%); 150 kW or more: 82 locations.
45% of the locations are confirmed by two or more sources; 99% were last confirmed in 2025 or 2026.
Cities
| City | Locations |
|---|---|
| Zaragoza | 4 |
| Salamanca | 4 |
| Seville | 3 |
| Madrid | 3 |
| Collado-Villalba | 3 |
| Las Palmas de Gran Canaria | 2 |
| Jerez de la Frontera | 2 |
| Córdoba | 2 |
| Tudela | 2 |
| Pamplona | 2 |
| Getafe | 2 |
| Zafra · on the map | 1 |
| Villanueva de la Serena | 1 |
| Toledo | 1 |
| Telde | 1 |
| San Juan de Aznalfarache | 1 |
| Rota · on the map | 1 |
| Pájara | 1 |
| Marchena · on the map | 1 |
| Linares | 1 |
| Jaén | 1 |
| Ingenio · on the map | 1 |
| Gandia | 1 |
| Dos Hermanas | 1 |
| Ciudad Real | 1 |
| Benidorm | 1 |
| Andújar | 1 |
| Almendralejo | 1 |
| Agüimes | 1 |
| Águilas | 1 |
| Vitoria-Gasteiz | 1 |
| Valladolid | 1 |
| Torrelavega | 1 |
| Torredembarra | 1 |
| Teruel | 1 |
| Seseña · on the map | 1 |
| Segovia | 1 |
| Santurtzi | 1 |
| Santa Perpètua de Mogoda | 1 |
| Santander | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 1 | 1% |
| DC 50–149 kW | 3 | 3% |
| 150 kW and more | 82 | 95% |
Connectors
| Connector | Locations |
|---|---|
| CCS2 | 85 |
| CHAdeMO | 6 |
| Type 2 | 4 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.