Country guide · EU neighbours · checked 23.09.2026
EV charging in Slovenia
Slovenia's electric car market grew quickly in 2025–2026: battery-electric cars were about 11% of new passenger cars in 2025 and almost 20% in January–August 2026, while Borzen offered purchase subsidies of up to €7,800 that were oversubscribed by August 2026. Home wallboxes are sold by energy companies, car importers, electrical installers and online shops; several sellers quote prices with basic installation at the reduced 9.5% VAT rate, and a separate Borzen grant covers 55% of the cost up to €1,000 per charging point, with requests already above the 2026 budget. Public charging is led by Petrol and Elektro Ljubljana's Gremo na elektriko network, alongside IONITY, Tesla and MOONcharge; published prices run from €0.22–0.35/kWh for AC and €0.45/kWh for DC at Gremo na elektriko to €0.43–0.73/kWh at IONITY.
BlokVolt is run by the team of Evolako, a home-charger installer that works only in Serbia; in Slovenia BlokVolt sells nothing. Companies here are listed by the same rules as everywhere on the site: only what their own websites say, with the date of the check, no ratings and no paid placements. Every figure below has its source, and weak sources are marked as such.
Key numbers
| Figure | Value | Source |
|---|---|---|
| New battery-electric cars registered, 202511.1% of 57,557 new passenger cars; 3,142 in 2024, so sales doubled. Other reports give 6,419 (+103.9%, Lider, 16.08.2026) and 6,430 (Eurostat via STA, Avto magazin, 02.08.2026). | 6,387 | Source: Slovenski avtomobilski trg v letu 2025 | AMZS · 26.01.2026 · medium reliability |
| Growth of new electric passenger cars first registered, 2025 (SURS)According to the Statistical Office (SURS) as reported: 11% of all new passenger cars first registered in 2025 were electric; hybrids and electric cars together were half of new cars. Slovenia had almost 1.3 million registered passenger cars at the end of 2025. | +104% | Source: Slovenija ima skoraj 1,3 milijona registriranih avtomobilov, 2025 je bil vsak drugi hibrid ali električen | Lider.si · 09.04.2026 · medium reliability |
| New battery-electric cars registered, January–August 202619.9% of the gross new-car market. August 2026 alone: 1,649 new electric cars, 33% of the market. The article does not name its data source. | 9,203 | Source: Zadnji rekordi pred koncem subvencij? Poleti je bil vsak tretji že električni. - siol.net · 07.09.2026 · medium reliability |
| New battery-electric cars registered, January–July 20263,231 in January–July 2025 (+133%); 18.5% share year to date and 26% in July. Data cited from the vehicle section of the Chamber of Commerce (Sekcija vozil pri Trgovinski zbornici Slovenije). | 7,554 | Source: Električni avtomobili 'pojedli' subvencije: bo denarja zmanjkalo že poleti? - siol.net · 08.08.2026 · medium reliability |
| Battery-electric share of all registered passenger cars, end of 2025No exact count given. The same article reports a 26% battery-electric share of new registrations in June 2026 (ICCT data). Sources cited: Eurostat, ACEA, SURS, ICCT. | 2% | Source: Slovenija je junija dosegla 26-odstotni delež električnih avtomobilov, v voznem parku jih ima dva odstotka | Lider.si · 16.08.2026 · medium reliability |
| Battery-electric cars on the road (rounded)Rounded figure from Forbes Slovenia; the article does not name its source. The same article counts about 74,000 hybrids. | about 24,000 | Source: Rekordna prodaja električnih vozil v Sloveniji. Kako jih bomo polnili - Forbes Slovenija · 18.07.2026 · low reliability |
| Publicly accessible charging points (EAFO), December 20252,041 AC and 504 DC fast-charging points, according to the European Alternative Fuels Observatory (EAFO) as quoted by Forbes Slovenia. The same article says the number passed 3,000 by mid-2026 and that about 300 AC and 120 DC points were added in 2025. | about 2,545 | Source: Rekordna prodaja električnih vozil v Sloveniji. Kako jih bomo polnili - Forbes Slovenija · 18.07.2026 · medium reliability |
| Charging points of the two largest operatorsAs stated by Forbes Slovenia. Elektro Ljubljana's Gremo na elektriko site says its system has more than 1,200 charging points. | Petrol about 1,100; Elektro Ljubljana about 1,000 | Source: Rekordna prodaja električnih vozil v Sloveniji. Kako jih bomo polnili - Forbes Slovenija · 18.07.2026 · medium reliability |
Public charging
How many public chargers: just over 4,600 charging points at almost 1,500 locations. Map by DeMS (Društvo e-Mobilnost Slovenija) based on the official register of charging infrastructure (NAP / Prometej – register-evse-id), at the time of publication. EAFO figures quoted by Forbes Slovenia are lower (about 2,545 publicly accessible points in December 2025; over 3,000 by mid-2026); the figures come from different datasets and dates. Source: Kje je najbližja polnilnica? DeMS predstavlja nov zemljevid javnih polnilnih mest za EV v Sloveniji - DEMS · 28.08.2026 (updated 29.08.2026) · medium reliability
| Network | Size | Prices | Payment |
|---|---|---|---|
| Gremo na elektrikoElektro Ljubljana d.d.App: Gremo na elektriko (mobile app and web app) | More than 1,200 charging points across Slovenia (operator site); about 1,000 (Forbes Slovenia, 18.07.2026). 'Eko' charging was available at 67 chargers (Elektro Ljubljana, 13.03.2024). | AC up to 22 kW 0,35 €/kWh VAT incl.Source: gremonaelektriko.si · prices valid from 01.07.2023 (as shown) · high reliability AC 'eko' charging (power reduced at peak times) 0,22 €/kWh VAT incl.Source: gremonaelektriko.si · prices valid from 01.07.2023 (as shown) · high reliability DC 0,45 €/kWh VAT incl.Source: gremonaelektriko.si · prices valid from 01.07.2023 (as shown) · high reliability Session fee 0,50 € (AC); 1,00 € (DC) VAT incl.Source: gremonaelektriko.si · prices valid from 01.07.2023 (as shown) · high reliability Time surcharge 0,03 €/min for AC charging over 180 minutes (applied only 06:00–19:00); 0,03 €/min for DC over 60 minutes VAT incl.Source: gremonaelektriko.si · prices valid from 01.07.2023 (as shown) · high reliability | App or web app with a payment card; 'Polni in plačaj' (pay after charging, for occasional users); prepaid account; RFID card (5,00 € production fee). Parking fees may apply in paid zones. |
| PetrolPetrolApp: OneCharge (named on Petrol's page) | More than 100 locations in Slovenia (Petrol website); about 1,100 charging points (Forbes Slovenia, 18.07.2026). Regular, fast and ultra-fast chargers. | AC up to 22 kW (registered card users) 0,39 €/kWhSource: primerjam.si · no date on page · low reliability DC 22–50 kW (registered card users) 0,50 €/kWhSource: primerjam.si · no date on page · low reliability HPC over 50 kW (registered card users) 0,70 €/kWhSource: primerjam.si · no date on page · low reliability Offer for customers of Petrol home electricity 50% off public charging for the first 10,000 km per yearSource: petrol.si · no date on page (published under 2026/03) · high reliability | OneCharge app named on the page; other payment details not visible on the reachable page. |
| IONITYIONITYApp: IONITY app | Not stated for Slovenia on the reachable pages | Direct (ad hoc, no app or subscription) – displayed minimum price 0.73 €/kWh VAT incl.Source: ionity.eu · no date on page; checked 23.09.2026 · high reliability 'Go' plan 0.69 €/kWh VAT incl.Source: ionity.eu · no date on page; checked 23.09.2026 · high reliability 'Motion' subscription (5.99 € per month) 0.54 €/kWh VAT incl.Source: ionity.eu · no date on page; checked 23.09.2026 · high reliability 'Power' subscription (11.99 € per month) 0.43 €/kWh VAT incl.Source: ionity.eu · no date on page; checked 23.09.2026 · high reliability Annual plan fees Motion 59.99 € per year (49.99 € discounted); Power 119.99 € per year (99.99 € discounted) VAT incl.Source: ionity.eu · no date on page; checked 23.09.2026 · high reliability | IONITY app, RFID cards or tokens, Plug & Charge, QR code on the charger, and contracts of mobility service providers. IONITY notes prices may vary by charging point and may be higher than the displayed minimum. |
| Tesla SuperchargerTeslaApp: Not stated on the page | Not stated on the reachable page | Congestion fee (when the station is fully occupied and the car stays connected after charging or above 80%; 5-minute grace period) 0,50 €/minSource: tesla.com · no date on page; checked 23.09.2026 · high reliability Charging price per kWh Not published on the fees pageSource: tesla.com · no date on page; checked 23.09.2026 · high reliability | Not stated on the page |
| MOONchargePorsche Slovenija d.o.o.App: MOONcharge app | Not stated; roaming access to Gremo na elektriko, MegaTel, Petrol, eFrend and IONITY Slovenija chargers | Charging price Not shown on the page; billed per kWh with a base rate for the first 180 minutes (AC) or 60 minutes (DC), then additional feesSource: moon-energija.si · no date on page (© 2026); checked 23.09.2026 · high reliability | Visa or Mastercard in the app; monthly invoice with the Porsche Group Card for businesses. |
| GEN-I Charge (service provider)GEN-I (e-mobility service provider giving access to other operators' charging points)App: Moj GEN-I Charge | Access to more than 250,000 public charging points in 28 European countries | User card / service fee 1,22 € per month per user card (card issued free of charge)Source: gen-i.si · no date on page; checked 23.09.2026 · high reliability | GEN-I Charge card or app; charging history and map in the app. |
Electricity at home
What a kilowatt-hour costs at home — the number to compare with public charging.
| Tariff | Price | Source |
|---|---|---|
| Household energy price, GEN-I regular price list (energy only)Valid from 1.3.2025; the page states prices stay unchanged until 31.12.2027 for eligible customers. Monthly fee 1,99 € (2,43 € incl. VAT), or 0,99 € with e-billing. Network charge, excise duty and contributions are billed separately. VT = higher tariff, MT = lower tariff, ET = single tariff. | VT 0,11990 / MT 0,09790 / ET 0,10890 €/kWh excl. VAT; 0,14628 / 0,11944 / 0,13286 €/kWh incl. 22% VAT | Source: Redni cenik električne energije za gospodinjske odjemalce – GEN-I · valid from 01.03.2025 (as shown) · high reliability |
| Household energy price range across suppliersPrice comparison site; energy component only. Network charges are the same for all suppliers. | VT 0.11490–0.13190 (average 0.12373); MT 0.09595–0.12790 (average 0.10364); ET 0.10190–0.12990 (average 0.11315) €/kWh excl. VAT | Source: Cena elektrike v Sloveniji 2026: najnižja, povprečna in najvišja cena kWh | Tarifnik · September 2026 (as shown) · low reliability |
| Last government-regulated household price (ended)Decree on electricity prices (Uradni list RS, No. 96/2024), valid from 1.11.2024 to 28.2.2025. No regulated household price for 2026 was found in this check. | VT 0,08400 / MT 0,07000 / ET 0,07700 €/kWh excl. VAT | Source: Portal Energetika - Ukrepi za omilitev draginje - Električna energija · no date on page; checked 23.09.2026 · high reliability |
| End of price regulationThe minister said the government did not intend to extend electricity price regulation from March 2025; the regulated single-tariff price was 77 €/MWh excl. VAT and covered 90% of consumption. | Not applicable | Source: Kumer: Vlada z marcem ne namerava podaljšati regulacije cen elektrike - RTV SLO · 09.02.2025 · medium reliability |
| Network charge (omrežnina): tariff system and 2025–2027 transitionEnergy Agency (Agencija za energijo) council approved amendments on 29.9.2025. New time-block definitions apply from 1.1.2027; the higher (November–February) and lower seasons remain. Agreed billing power is the average of five peaks per time block over 12 months. The Agency estimates an average household pays a little over 8 € less network charge per month during the 50% phase. | Block 1 (most expensive) tariff reduced by 50% in November 2025–February 2026, by 30% in the following higher season and by 10% in November–December 2027 | Source: Svet agencije za energijo obravnaval in potrdil dopolnitve metodologije za obračun omrežnine - URO · 01.10.2025 · high reliability |
| Network charge, 2026 exampleBlock 1 does not apply in the lower season (March–October). An average four-person household (4,000 kWh a year, 4.2 kW) pays about 171 € network charge in 2026 compared with 222 € in 2025, according to the article citing the Energy Agency. | Block 1 power tariff 1,71 € per kW per month in January–February 2026 (half of 3,42 €) | Source: Omrežnina v januarju 2026 še s polovičnimi tarifami v najdražjem bloku | Lider.si · 26.01.2026 · medium reliability |
| Renewables and CHP contribution (prispevek OVE+SPTE)Charged again from August 2025 bills, according to the consumer association ZPS. | 0,77562 € per kW of power (0,94626 € incl. VAT) | Source: Pregled cen električne energije in zemeljskega plina (ZPS) · 11.09.2026 · medium reliability |
| VAT on household electricityStandard rate shown in the GEN-I household price list. | 22% | Source: Redni cenik električne energije za gospodinjske odjemalce – GEN-I · valid from 01.03.2025 (as shown) · high reliability |
| All-in cost of charging at home (rough estimate)Estimate for household electricity given by a comparison site. | about 0,17 €/kWh | Source: Koliko stane polnjenje električnega avtomobila v Sloveniji? - Primerjam.si · no date on page · low reliability |
Subsidies
Amount: Individuals (sklop A), new M1 cars by total price incl. VAT: 7.800 € (up to 25.000 €), 7.200 € (25.000,01–35.000 €), 6.500 € (35.000,01–45.000 €), 4.500 € (45.000,01–65.000 €). Used or test M1/N1: 3.000 € (up to 45.000 €), 2.000 € (45.000,01–65.000 €). L-category vehicles: 300–1.500 €.
Who: Sklop A: any adult with permanent residence in Slovenia (not self-employed or registered for business). Sklop B: businesses, sole traders and public-law bodies (not direct state budget users).
Deadline: Applications from 18.6.2026 10:00 until funds are used or closure is announced; for vehicles over 45.000 € (sklop A) only applications filed by 31.8.2026.
Budget 25.604.648,00 € (sklop A) and 8.000.000,00 € (sklop B). Vehicles bought from 1.1.2026 and first registered in Slovenia. Borzen's notice: requested amounts already exceed the available funds for both individuals and legal entities, so late applications may be rejected. Media report the ministry had no more Climate Fund money to top up the call (Siol, 08.08.2026) and that the subsidy period ended in August 2026 'at least for now' (Siol, 07.09.2026). No formal closure notice was found.
Source: Subvencije za e-vozila fizičnih in pravnih oseb 2026 · published 12.05.2026; amended 18.05.2026 · high reliabilityAmount: Individuals (sklop A): 55% of eligible purchase and installation costs, up to 1.000 € per charging point, max. 2 points (2.000 €). Businesses (sklop B): 55%, up to 1.300 € per charging point.
Who: Sklop A: adults with permanent residence in Slovenia and a tax number (not self-employed). Sklop B: self-employed persons, sole traders and legal entities.
Deadline: Applications from 14.5.2026 10:00 until funds are used or closure is announced.
Budget 4.000.000 € for 2026–2027 (3.200.000 € sklop A, 800.000 € sklop B). Charger installed after 1.10.2025, new AC unit 3.7–22 kW, Type 2, with dynamic load management; VAT is an eligible cost for individuals; applicant must keep the charger for at least 5 years; installed at the applicant's permanent residence or on property they own. Borzen's notice: requested amounts already exceed the sum planned for 2026.
Source: Subvencije za nakup električnih polnilnih mest za EV 2026 · published 19.03.2026; amended 16.04.2026 · high reliabilityAmount: Not verified
Who: Not verified
Deadline: Not verified
The Eko sklad website did not load (certificate error) on 23.09.2026. The 2026 purchase grants for EVs and home chargers are run by Borzen (see above); whether Eko sklad offers anything for EVs in 2026 (for example loans) could not be checked.
Source: Električna vozila: Subvencija | Eko sklad (did not load) · not loaded · low reliabilityCharging in an apartment building
What the law says about a charger in a shared garage or parking lot — who has to agree, who pays for the electricity and how it is metered.
When works in an owner's own unit also interfere with common parts of the building, the owner may not start them without the consent of co-owners holding more than half of the co-ownership shares in those common parts; the works must follow building rules and be professionally supervised.
Law: Stanovanjski zakon (SZ-1), Article 15 (consolidated text valid from 13.08.2025)
Source: 15. člen SZ-1 • Stanovanjski zakon - SZ-1 • Zakonodaja • Računovodstvo.net · valid from 13.08.2025 (as shown) · medium reliabilityAnswering a 2017 citizen proposal on charging in apartment blocks, the Ministry of the Environment and Spatial Planning applied Article 15 of SZ-1: if the works also touch common parts, consent of co-owners holding more than half of the co-ownership shares is needed. It found no legal basis for requiring unanimous consent for a private charger.
Law: Stanovanjski zakon (SZ-1), Article 15
Source: Električni avtomobil v bloku - Predlog · proposal 19.10.2017; ministry answer 28.12.2017 · high reliabilityCo-owners holding more than three quarters of the co-ownership shares decide on building works on common parts of a multi-apartment building that require a building permit.
Law: Stanovanjski zakon (SZ-1), Article 29, as amended by SZ-1E (Uradni list RS, No. 90/2021, 4.6.2021)
Source: Zakon o spremembah in dopolnitvah Stanovanjskega zakona (SZ-1E) · 04.06.2021 · high reliabilityConsent of all co-owners is required for changes between common and individual parts, for special restrictions on the use of individual or common parts, and for changing the use of common parts.
Law: Stanovanjski zakon (SZ-1), Article 29 (consolidated text valid from 13.08.2025)
Source: 29. člen SZ-1 • Stanovanjski zakon - SZ-1 • Zakonodaja • Računovodstvo.net · valid from 13.08.2025 (as shown) · medium reliabilityA legal Q&A from the newspaper Dnevnik (republished on the Na novinah portal) says that, according to case law, changing the use of a parking area needs the consent of all co-owners; a shared charging project is a matter beyond ordinary management, and co-owners holding more than half of the shares in the common parts can ask a court to decide in non-contentious proceedings.
Law: Stanovanjski zakon (SZ-1) and case law, as explained in the article
Source: Polnjenje električnega avtomobila pred blokom | DNEVNIK - NA NOVINAH · 13.12.2022 (republished 03.06.2023) · medium reliabilityIn the same Q&A the resident's plan is to feed the garage charger from their own apartment, through their own electricity meter; the expert assesses such individual works under Article 15 of SZ-1.
Law: Stanovanjski zakon (SZ-1), Article 15
Source: Polnjenje električnega avtomobila pred blokom | DNEVNIK - NA NOVINAH · 13.12.2022 (republished 03.06.2023) · medium reliabilityAvto magazin notes that the cost of shared electricity can be allocated by installing additional sub-meters (odštevalni števci), but that this is not always feasible; it names owners' consent as the biggest obstacle.
Law: Not cited
Source: Električne polnilnice v večstanovanjskih stavbah - Kdaj lahko pričakujemo spremembe? - Aktualno - Avto Magazin · 22.09.2021 · medium reliabilityThe 2025 housing law amendment lists a 'skupna polnilna postaja' (shared charging station) among the common parts of residential and multi-apartment buildings, in the article on serious damage caused by tenants. It applies from 1.12.2025.
Law: SZ-1G (Uradni list RS, No. 57/2025, 29.7.2025), amending Article 103 of SZ-1
Source: Zakon o spremembah in dopolnitvah Stanovanjskega zakona (SZ-1G) · 29.07.2025 · high reliabilityBorzen's 2026 home-charger call has no specific provisions for multi-apartment buildings, co-owner consent or the building manager; the charger must be at the applicant's permanent residence or on property the applicant owns, and the applicant must remain its owner for at least five years.
Law: Javni poziv JP SZPI 2026 (clean copy with 1st amendment)
Source: Javni poziv SZPI 2026 (čistopis s 1. spremembo) · 16.04.2026 (version 01) · high reliabilityA reader's account describes the steps taken in one building: consent of more than 50% of co-owners by co-ownership shares, design documentation (PZI), certified electrical measurements and a fire-safety assessment. The charger was connected to the existing apartment meter, and the building manager (upravnik) received the documentation afterwards. The rules were described as loose and fire-safety requirements as unclear.
Law: No specific law cited
Source: Težava, ki jo bo treba rešiti, če bo električnih avtomobilov vse več - Žurnal24 · 01.08.2026 · low reliabilityThe e-mobility association DeMS says charging in multi-apartment buildings is often handled through administrative limits or general bans instead of an individual technical assessment, and calls for a move 'from bans to technical conditions' based on European and IEC standards and fire-safety requirements.
Law: Energy legislation (discussed in the article)
Source: Energetski zakon: Vsaka »nova rešitev« lahko dodatno oteži dostop do polnilnic v večstanovanjskih stavbah - DEMS · 03.05.2026 (updated 02.06.2026) · medium reliabilityAccording to Avto magazin, the Efficient Use of Energy Act (ZURE) requires new buildings and major renovations with larger car parks to fit chargers or cable ducting on part of the parking spaces; for multi-apartment buildings the article cites ducting at every tenth parking space.
Law: Zakon o učinkoviti rabi energije (ZURE); article not cited in the source
Source: Električni avto in življenje v bloku - kakšne so možnosti in (predvsem) ovire? - Avto-magazin.si · 28.02.2024 · medium reliabilityNo Slovenian company advertising a dedicated service for multi-apartment buildings (shared installation with per-resident billing) was found on the pages checked. Some sellers address blocks indirectly: Enertec recommends RFID/PIN-protected chargers for shared garages, EVJ notes RFID identification is useful in apartment blocks, and Plan-net Solar's enquiry form includes a multi-apartment building option.
Law: Not applicable
Source: Polnilne postaje za dom - Enertec · checked 23.09.2026 · low reliabilityHome chargers: who sells and installs them 15
Companies that sell wallboxes or install home chargers in Slovenia, as their own websites describe them. Prices are copied as published, with the currency and VAT as stated on the page. Yes — installation is offered on the company's site · On request — offered, without a price or terms · Not mentioned — nothing about installation on the site.
| Company | What they offer | Published price | Installation |
|---|---|---|---|
| Petrol (eShop)Nationwide (online shop; free delivery to Petrol stations)Brands: Etrel, V2C (Trydan), GoBox, LiteBoxchecked no date on page; checked 23.09.2026 | Energy and fuel company selling home chargers online; some models are sold with basic installation and certified measurements. Also publishes guides on installation and on the Borzen subsidy. | ETREL INCH PRO 22 kW + DLM: 1.330,43 € incl. VAT, installation included; LiteBox 22 kW RFID with installation and certified measurements: 899,99 € (was 1.349,04 €); TRYDAN V2C 22 kW + RCD switch: 875,14 €; GoBox 3–11 kW + adapter: 349,00 € (was 399,00 €). VAT status is shown only on the INCH PRO product page.≈ 349.00–1330.43 | YesBasic installation on a pre-prepared point: commissioning and test, user briefing, delivery anywhere in Slovenia and certified measurements. The reduced 9.5% VAT rate applies if the charger is installed on a permanent dwelling of up to 250 m² (house) or 120 m² (flat in a multi-apartment building). |
| MOON (Porsche Slovenija d.o.o.)Not stated on pageBrand: MOONchecked no date on page (© 2026); checked 23.09.2026 | Home and business chargers with advice, planning, installation and service; also runs the MOONcharge public-charging app. | MOON Charger 2 (home, up to 22 kW): from 731 € excl. 22% VAT; MOON Community Pro: from 1.204 € excl. 22% VAT; POWER2Go mobile charger: from 1.299 € excl. 22% VAT≈ from 731 (excl. VAT) | YesInstallation offered; price not published (enquiry form). |
| Porsche Inter Auto d.o.o.LjubljanaBrand: MOONchecked no date on page; checked 23.09.2026 | Car dealer selling MOON Community home charging stations (3.6–22 kW, Type 2, smart charging, wall or free-standing) with installation by certified installers. | Not published (quote on request) | YesThree packages: 1) installation, certified measurements and configuration; 2) adds a dynamic load-management module; 3) adds up to 10 m of cable conduit and circuit breakers. Mentions installation in front of apartment blocks among possible locations. |
| ECE d.o.o.CeljeBrands: myenergi (zappi), V2C (Trydan)checked no date on page; checked 23.09.2026 | Electricity supplier selling home chargers (3.7–22 kW) with turnkey installation completed in one day; payment in instalments available. | myenergi zappi 22 kW + basic installation (without solar): 1.340,00 € (1.308,00 € with ECE bonus), incl. 9.5% VAT; zappi versions with solar: 1.440,00 € (1.408,00 € with bonus); V2C Trydan 22 kW: 1.230,00 € (1.198,00 € with bonus)≈ 1198.00–1440.00 | YesBasic installation on pre-prepared wiring, three current transformers and certified measurements with report (needed for the subsidy). Supply cable (5x6 mm², up to 25 m), RCD and breakers are prepared separately. |
| Enertec d.o.o.MariborBrand: Etrel (INCH Home, INCH Pro, INCH Pro Duo)checked modified 09.06.2026 (page metadata) | Home charging stations with app control and dynamic power adjustment, plus fixed-price installation packages. | Installation: basic package 279,00 € incl. 9.5% VAT; extended package from 399,00 € incl. 9.5% VAT. Charger prices not published on the page.≈ 279.00–399.00+ (installation only) | YesBasic: wall mounting, connection to a pre-prepared supply, communication setup, configuration, testing, electrical measurements and travel within 60 km. Extended adds a disconnect switch, up to 10 m of 5x6 mm² cable in trunking and up to 15 m of Cat 6 cable. Recommends RFID/PIN-protected models for shared garages. |
| ENERSON d.o.o.MariborBrands: Enelion, Metronchecked 17.02.2025 | Solar installer offering home chargers with installation. | Charger with installation 'does not exceed 1.500 €', depending on functions; chargers 700–1.200 €, installation and extra work 250–800 € (VAT not stated)≈ up to 1500 (with installation) | Yes |
| Elektro Požun d.o.o.LitijaBrands: Wallbox, SolarEdge, Etrel, Tigo, FOX, Metronchecked modified 19.08.2026 (page metadata) | Electrical installer selling 22 kW home chargers with basic installation included; helps with subsidy applications. Separate business prices excl. VAT. | WALLBOX Pulsar Plus 22 kW: 1.350,00 €; WALLBOX Commander 2 22 kW: 1.700,00 €; FOX 22 kW: 1.349,00 €; Metron 22 kW: 1.649,00–1.799,00 €; Etrel 22 kW: 2.298,00 € (all incl. 9.5% VAT, basic installation included)≈ 1349.00–2298.00 | YesBasic installation: connection at an existing 3-phase socket or a prepared cable (max 5x6 mm²), one wall penetration, and fitting a meter (if in the package) in the main panel, which needs at least 4 free breaker slots. |
| Solarni svetVišnja GoraBrand: Wallboxchecked modified 13.06.2026 (page metadata) | Online shop and installer; wallbox sold with or without installation. | Wallbox Pulsar Plus 22 kW (3-phase): 890,00 € incl. VAT without installation; 1.250,00 € with installation (VAT not stated for this option)≈ 890.00–1250.00 | YesInstallation option covers connection to a pre-prepared electrical point. |
| Elektro Ljubljana OVE d.o.o.Ljubljanachecked modified 14.05.2025 (page metadata) | Supply and installation of home, public and fast charging stations; home options single-phase 3.7 or 7.4 kW and three-phase up to 22 kW. | Not published | YesOffer on request by phone or e-mail. |
| Sol Navitas Instalacije d.o.o.CeljeBrands: SolarEdge, Elinta, Sigenergychecked published 17.04.2026, modified 19.06.2026 | Supply and installation of charging stations for homes, with subsidy guidance. | Not published | Yes |
| EVJ d.o.o. (elektroprom.si)KisovecBrand: Enel X (JuiceBox, JuicePole)checked no date on page; checked 23.09.2026 | Sells home and business chargers; connection to the electrical panel arranged after a site visit. | JuiceBox PRO 32 (up to 22 kW 3-phase or 7.4 kW 1-phase): 680,90 € + VAT; Enel X JuicePole: 3.770,00 € + VAT (devices only)≈ 680.90 (excl. VAT) | On requestConnection costs quoted after inspection, depending on materials. Notes that RFID identification limits charging to the owner, 'useful in apartment blocks'. |
| napolniavto.si (IR paneli d.o.o.)KamnikBrands: Besen, Teison, Sunpoint, Peblarchecked no date on page; checked 23.09.2026 | Online shop for home and public charging stations and accessories; viewing or pick-up by appointment. | Besen BS20C 11 kW: 516,06 € (was 549,00 €); Besen BS20C 22 kW: 628,86 €; Teison Smart 11 kW: 779,26 €; Teison Smart 22 kW: 845,06 €; Peblar Home 11 kW: 999,00 € (VAT status not stated)≈ 516.06–999.00 | Not mentioned |
| Metron (Metron inštitut)Not stated on pageBrand: Metronchecked modified 21.09.2026 (page metadata) | Slovenian maker of charging stations with its own web shop and custom orders. | Polnilna postaja STANDARD (with cable; 3.7 or 11 kW, expandable to 7.2 or 22 kW): 845,00 € excl. VAT≈ 845.00 (excl. VAT) | Not mentionedMetron chargers are also sold with installation by installers such as Elektro Požun and Enerson. |
| EtrelŠkofljicaBrand: Etrelchecked no date on page; checked 23.09.2026 | Slovenian charger manufacturer (INCH range). Its website addresses business customers, charge point operators and partners; its home chargers are listed by resellers such as Petrol and Elektro Požun. | Not published on the manufacturer's site | Not mentioned |
| Plan-net Solar d.o.o.Not stated on pagechecked no date on page (© 2026); checked 23.09.2026 | Advice, choice of solution, installation and support for smart home EV chargers, including links with solar systems; the enquiry form offers 'večstanovanjski objekt' (multi-apartment building) as a location type. | Not published | Yes |
Price ranges from other sources
- Wallbox with basic installation – list prices on company sites: 899,99 € – 2.298,00 € — Examples: LiteBox 22 kW 899,99 € and Etrel INCH PRO 1.330,43 € incl. VAT (Petrol); Wallbox Pulsar Plus 1.250,00 € (Solarni svet) and 1.350,00 € incl. 9.5% VAT (Elektro Požun); myenergi zappi 1.340,00 € incl. 9.5% VAT (ECE); Etrel 22 kW 2.298,00 € incl. 9.5% VAT (Elektro Požun). Basic installation assumes a pre-prepared supply cable. Source: Company pages: Elektro Požun, Petrol eShop, Solarni svet, ECE shop (see home_companies) · checked 23.09.2026 · high reliability
- Wallbox without installation – list prices on company sites: 516,06 € – 999,00 € (VAT treatment varies) — Examples: Besen BS20C 11 kW 516,06 € and Peblar Home 999,00 € (napolniavto.si, VAT not stated); JuiceBox PRO 32 680,90 € + VAT (EVJ); MOON Charger 2 from 731 € excl. VAT; Metron STANDARD 845,00 € excl. VAT; Wallbox Pulsar Plus 890,00 € incl. VAT (Solarni svet). Source: Company pages: napolniavto.si, EVJ, MOON, Metron, Solarni svet (see home_companies) · checked 23.09.2026 · high reliability
- Installation package only (installer list price): 279,00 € (basic) – from 399,00 € (extended), incl. 9.5% VAT — Enertec, Maribor; travel within 60 km included. Source: Polnilne postaje za dom - Enertec · modified 09.06.2026 (page metadata) · high reliability
- Charger, installation and wiring in a house (average): about 1.500 € incl. VAT — Forbes Slovenia; the Borzen subsidy roughly halves this amount. Source: Rekordna prodaja električnih vozil v Sloveniji. Kako jih bomo polnili - Forbes Slovenija · 18.07.2026 · medium reliability
- Wallbox (device only), market range: 630 – 1.600 € — Comparison and request site; depends on power (3.7–22 kW) and connector type. VAT not stated. Source: Ceniki - cene 2026: Polnilnica za električna vozila - Primerjam.si · no date on page · low reliability
- Installation (basic), market range: 190 – 310 € — Same site; excludes larger work such as wall penetrations or changes to the electrical installation. VAT not stated. Source: Ceniki - cene 2026: Polnilnica za električna vozila - Primerjam.si · no date on page · low reliability
- Wallbox by power (device only), estimate: 7.4 kW: 600–900 €; 11 kW: 800–1.500 €; 22 kW: 1.200–2.000 € — Energy-savings blog; installation 300–600 € (basic) or 600–1.200 € (longer wiring or modifications); total 1.100–2.500 € before subsidy. Source: Polnilnica za električni avto 2026: cena in subvencije · 23.02.2026 · low reliability
- VAT on a charger supplied with installation in a home: 9.5% (reduced rate) instead of 22% — Petrol states the reduced rate applies when the charger is installed on a residential building used for permanent living, with usable floor area up to 250 m² (single-dwelling building) or 120 m² (dwelling in a multi-apartment building). Source: Električna polnilnica ETREL INCH PRO 22KW + DLM | Petrol eShop · no date on page; checked 23.09.2026 · medium reliability
National plans and EU rules
- Slovenia's Act on Alternative Fuels Infrastructure and Promoting the Transition to Alternative Fuels in Transport (ZIAG) was published in Uradni list RS, No. 62/2023, on 6 June 2023. Source: uradni-list.si · 06.06.2023 · high reliability
- Under the EU Alternative Fuels Infrastructure Regulation (AFIR), each registered battery-electric car must be matched by at least 1.3 kW, and each plug-in hybrid by at least 0.8 kW, of publicly accessible charging power; the EU's Alternative Fuels Observatory tracks Slovenia against this fleet-based target. Source: alternative-fuels-observatory.ec.europa.eu · reference data: fleet Q1 2026, infrastructure July 2026 · high reliability
- According to Forbes Slovenia, the National Energy and Climate Plan (NEPN) foresees about 93,000 new electric vehicles in 2026–2030, roughly three times as many as in the previous five years. Source: forbes.n1info.si · 18.07.2026 · medium reliability
- A 15 million € public call (JRPM IZVEN-TEN-T-2026, published 6 March 2026) funds publicly accessible charging outside the TEN-T road network with up to 100% co-financing (up to 10,000 € per AC point, 25,000 € per 50–150 kW DC point and 40,000 € per DC point above 150 kW), at least 10 charging points per project, 16 hours of daily public access, applications by 31 July 2026 and completion by 31 October 2027. Source: sol-navitas.si · 25.03.2026 · low reliability
What could not be verified
Known gaps. If you can fill one with a public source, write to hello@blokvolt.com.
- Eko sklad (ekosklad.si) did not load (certificate error); any 2026 Eko sklad offer for electric vehicles, such as loans, is unverified.
- The Statistical Office site (stat.si) did not load; SURS figures are taken from media that quote SURS.
- pisrs.si needs JavaScript and could not be read; law texts were checked in the Official Gazette (uradni-list.si) and in a legal database (racunovodstvo.net).
- EAFO country pages show data only in interactive charts; EAFO charging-point numbers are quoted from Forbes Slovenia.
- No exact count of battery-electric cars on the road was found; only a rounded figure (about 24,000, source not named) and a 2% fleet share.
- 2025 sales conflict: Forbes Slovenia (18.07.2026) says 2,700 new electric vehicles were sold in 2025, while AMZS, SURS-based and Eurostat-based reports give about 6,400 battery-electric cars; the Forbes figure was not used.
- Public charging counts differ by dataset: EAFO (about 2,545 in December 2025, over 3,000 by mid-2026) versus the official register as mapped by DeMS (over 4,600 points in August 2026).
- Petrol's public-charging price list did not render; Petrol per-kWh prices come from an undated comparison site and are unverified.
- The Gremo na elektriko PDF price list is blocked by robots.txt; prices were taken from the operator's 'Vozniki' page (valid from 1.7.2023).
- Energija plus (energijaplus.si and polnilnepostaje.energijaplus.si) returned server errors; its home-charger offer and public-charging prices were not verified (a copy on a third-party domain was not used).
- The MOL Plugee Slovenia site (molplugee.si) timed out; MOL's network size and prices in Slovenia are unverified.
- Eleport is named as an operator by Forbes Slovenia, but eleport.com shows no Slovenia-specific data.
- Tesla Supercharger and MOONcharge per-kWh prices are not shown on the reachable pages; IONITY, Tesla and MOONcharge station counts in Slovenia were not found.
- Motorway (DARS / TEN-T) charging coverage and Slovenia's AFIR target attainment figures were not found on a reachable page.
- The official PDF of the JRPM IZVEN-TEN-T-2026 call on gov.si returned a 503 error; its details come from an installer's summary.
- No official source was found confirming whether any household electricity price regulation applies in 2026 (the last decree ended on 28.2.2025).
- Borzen JP SUB-EV26 still shows as open with an over-subscription notice; media report the money ran out in August 2026, but no formal closure notice was found.
- No 2026 legal change giving apartment residents a 'right to plug' (for example, transposition of the recast EU buildings directive) was confirmed; the only charging reference found in the SZ-1G amendment is the shared charging station listed as a common part.
- The Efficient Use of Energy Act (ZURE) rules on chargers and ducting in buildings were not checked on an official source (the legal database returned an error); the summary comes from Avto magazin.
- GEN-I's e-mobility page shows no home-charger offer; home-charger offers of E 3 and Elektro energija were not found.
- The installer site e-mobilni.eu timed out and elektricna-polnilnica.si did not resolve; online-only shops such as evmotions.si (operated by a Hungarian company) and marketplaces were not included as companies.
Sources
All 56 sources for this page
- Slovenski avtomobilski trg v letu 2025 | AMZS — 26.01.2026
- Slovenija ima skoraj 1,3 milijona registriranih avtomobilov, 2025 je bil vsak drugi hibrid ali električen | Lider.si — 09.04.2026
- Zadnji rekordi pred koncem subvencij? Poleti je bil vsak tretji že električni. - siol.net — 07.09.2026
- Električni avtomobili 'pojedli' subvencije: bo denarja zmanjkalo že poleti? - siol.net — 08.08.2026
- Slovenija je junija dosegla 26-odstotni delež električnih avtomobilov, v voznem parku jih ima dva odstotka | Lider.si — 16.08.2026
- Rekordna prodaja električnih vozil v Sloveniji. Kako jih bomo polnili - Forbes Slovenija — 18.07.2026
- Company pages: Elektro Požun, Petrol eShop, Solarni svet, ECE shop (see home_companies) — checked 23.09.2026
- Company pages: napolniavto.si, EVJ, MOON, Metron, Solarni svet (see home_companies) — checked 23.09.2026
- Polnilne postaje za dom - Enertec — modified 09.06.2026 (page metadata)
- Ceniki - cene 2026: Polnilnica za električna vozila - Primerjam.si — no date on page
- Polnilnica za električni avto 2026: cena in subvencije — 23.02.2026
- Električna polnilnica ETREL INCH PRO 22KW + DLM | Petrol eShop — no date on page; checked 23.09.2026
- Kje je najbližja polnilnica? DeMS predstavlja nov zemljevid javnih polnilnih mest za EV v Sloveniji - DEMS — 28.08.2026 (updated 29.08.2026)
- gremonaelektriko.si — prices valid from 01.07.2023 (as shown)
- primerjam.si — no date on page
- petrol.si — no date on page (published under 2026/03)
- ionity.eu — no date on page; checked 23.09.2026
- tesla.com — no date on page; checked 23.09.2026
- moon-energija.si — no date on page (© 2026); checked 23.09.2026
- gen-i.si — no date on page; checked 23.09.2026
- Redni cenik električne energije za gospodinjske odjemalce – GEN-I — valid from 01.03.2025 (as shown)
- Cena elektrike v Sloveniji 2026: najnižja, povprečna in najvišja cena kWh | Tarifnik — September 2026 (as shown)
- Portal Energetika - Ukrepi za omilitev draginje - Električna energija — no date on page; checked 23.09.2026
- Kumer: Vlada z marcem ne namerava podaljšati regulacije cen elektrike - RTV SLO — 09.02.2025
- Svet agencije za energijo obravnaval in potrdil dopolnitve metodologije za obračun omrežnine - URO — 01.10.2025
- Omrežnina v januarju 2026 še s polovičnimi tarifami v najdražjem bloku | Lider.si — 26.01.2026
- Pregled cen električne energije in zemeljskega plina (ZPS) — 11.09.2026
- Subvencije za e-vozila fizičnih in pravnih oseb 2026 — published 12.05.2026; amended 18.05.2026
- Subvencije za nakup električnih polnilnih mest za EV 2026 — published 19.03.2026; amended 16.04.2026
- Električna vozila: Subvencija | Eko sklad (did not load) — not loaded
- 15. člen SZ-1 • Stanovanjski zakon - SZ-1 • Zakonodaja • Računovodstvo.net — valid from 13.08.2025 (as shown)
- Električni avtomobil v bloku - Predlog — proposal 19.10.2017; ministry answer 28.12.2017
- Zakon o spremembah in dopolnitvah Stanovanjskega zakona (SZ-1E) — 04.06.2021
- 29. člen SZ-1 • Stanovanjski zakon - SZ-1 • Zakonodaja • Računovodstvo.net — valid from 13.08.2025 (as shown)
- Polnjenje električnega avtomobila pred blokom | DNEVNIK - NA NOVINAH — 13.12.2022 (republished 03.06.2023)
- Električne polnilnice v večstanovanjskih stavbah - Kdaj lahko pričakujemo spremembe? - Aktualno - Avto Magazin — 22.09.2021
- Zakon o spremembah in dopolnitvah Stanovanjskega zakona (SZ-1G) — 29.07.2025
- Javni poziv SZPI 2026 (čistopis s 1. spremembo) — 16.04.2026 (version 01)
- Težava, ki jo bo treba rešiti, če bo električnih avtomobilov vse več - Žurnal24 — 01.08.2026
- Energetski zakon: Vsaka »nova rešitev« lahko dodatno oteži dostop do polnilnic v večstanovanjskih stavbah - DEMS — 03.05.2026 (updated 02.06.2026)
- Električni avto in življenje v bloku - kakšne so možnosti in (predvsem) ovire? - Avto-magazin.si — 28.02.2024
- uradni-list.si — 06.06.2023
- alternative-fuels-observatory.ec.europa.eu — reference data: fleet Q1 2026, infrastructure July 2026
- sol-navitas.si — 25.03.2026
- Petrol (eShop) — company website — no date on page; checked 23.09.2026
- MOON (Porsche Slovenija d.o.o.) — company website — no date on page (© 2026); checked 23.09.2026
- Porsche Inter Auto d.o.o. — company website — no date on page; checked 23.09.2026
- ECE d.o.o. — company website — no date on page; checked 23.09.2026
- ENERSON d.o.o. — company website — 17.02.2025
- Solarni svet — company website — modified 13.06.2026 (page metadata)
- Elektro Ljubljana OVE d.o.o. — company website — modified 14.05.2025 (page metadata)
- Sol Navitas Instalacije d.o.o. — company website — published 17.04.2026, modified 19.06.2026
- EVJ d.o.o. (elektroprom.si) — company website — no date on page; checked 23.09.2026
- Metron (Metron inštitut) — company website — modified 21.09.2026 (page metadata)
- Etrel — company website — no date on page; checked 23.09.2026
- Plan-net Solar d.o.o. — company website — no date on page (© 2026); checked 23.09.2026
Something changed or is missing? Data is corrected from public sources and on request — free, by the same rules for everyone. Send the correction with a link to hello@blokvolt.com.
Other countries: Serbia · Montenegro · Bosnia and Herzegovina · North Macedonia · Croatia · Albania · Kosovo